1964 ranch, 1,491 SF, crawl space
| Service | Quantity | Price |
|---|---|---|
| 10101 Trashout / Demolition Haul-off and disposal of the replaced storm door, the burned electrical materials taken out at the HVAC disconnect, and the old HVAC equipment removed during the change-out. | 1 job | $295.00 |
| 10109 Doors & Trim Safety egress: the interior double-key deadbolt is replaced with a single-key thumb-turn deadbolt. | 1 lock | $150.00 |
| 10110 Ext. Doors The damaged storm door at the family room is replaced with a new storm door unit, weather-stripped and painted to match. | 1 door | $800.00 |
| 10121 Electrical Burned exterior HVAC disconnect removed and replaced; HVAC branch-circuit conductors and connections inspected for heat damage and damaged conductors, fittings, connectors and materials replaced as necessary; HVAC circuit breaker replaced if damaged or compromised; equipment reconnected with voltage and operation verified; exterior connections secured and weatherproofed. | 1 system | $1,500.00 |
| 10122 HVAC The existing R-22 unit is beyond repair and is replaced with a new complete system, started up and verified to safe and sound working order. | 1 system | $8,000.00 |
| 10123 Masonry Cracked and separating joints in the brick veneer ground out, pointed up and re-grouted with matching mortar. Pending the mason's measure. | pending measure | Pending |
| Total Masonry (10123) pending — quoted as its own number, not part of this total. | $10,745.00 |
Scope: All work described in the Included Scope above. Any work not listed is not included unless agreed in writing. The scope follows the repair items cited in the VA appraisal for this property; items outside that list are quoted separately. The masonry (10123) point-up and re-grout is pending a site measure and is quoted as its own number — it is not part of the total above.
Structural excluded: header reinforcement, joist repairs, subfloor sheet replacement, engineering, foundation modifications.
Contractor supplies: the new storm door unit, the deadbolt, the electrical materials for the disconnect-area repairs, and the new HVAC system and materials.
MEP contingency: if live wiring or plumbing is found inside the wall, or further electrical damage is found once the burned box is opened, a change order covers the additional work before it proceeds.
Paint: the new storm door is painted to match the existing exterior finish as part of the installation. No other painting is included.
Notes: Jobsite will be left clean once completed. The completed repairs are the ones cited in the appraisal so the property can be re-inspected for the loan.
Warranty: 12 months workmanship.
Payment Terms: Total Project Cost $10,745.00 · Deposit to Schedule $5,372.50 · Final Payment $5,372.50. Check is a preferred method.
You can pay by credit card using the link below.
request.plastiq.com/pay-tidewater-home-improvement-llc
Cards not eligible for payment: Virtual Affirm credit card
Validity: one (1) week from the date above — valid until September 23, 2026.